Acer Nitro V Gaming Laptop AMD Ryzen 7-7735HS with RTX 4050 6 GB Graphics (16 GB DDR5/512GB SSD/Windows 11 Home/ Wi-Fi 6/144Hz) ANV15-41, 15.6

Added by @rakhi on 13th February, 2025 at 7:25 PM.
₹73,740.00
28% off
MRP: ₹101,999 (Save ₹28,259)
Inc. ₹8250 OFF with HDFC CC

Offer Details

Acer Nitro V Gaming Laptop AMD Ryzen 7-7735HS with RTX 4050 6 GB Graphics (16 GB DDR5/512GB SSD/Windows 11 Home/Wi-Fi 6/144Hz) ANV15-41, 15.6" FHD Display, 2.1 KG

https://www.amazon.in/dp/B0DFWRZLK5?m=AJ6SIZC8YQDZX&th=1

MRP ₹101999  
Price ₹73740
Bank Offer  ₹ 8250
Your Savings ₹28/259 (27%)

 

 

About

  • Processor: AMD Ryzen 7-7735HS processor - 8 cores, max turbo up to 4.75 Ghz | RAM: 16 GB of DDR5 system memory, upgradable to 32 GB (Memory Frequency: Up to 4800 MT/s)
  • Display: 15.6" display with IPS (In-Plane Switching) technology, Full HD 1920 x 1080, Acer ComfyView LED-backlit TFT LCD, 16:9 aspect ratio, supporting 144 Hz refresh rate
  • Graphics: NVIDIA GeForce RTX 4050 with 6 GB of dedicated GDDR6
  • Storage: 512 GB SSD, PCIe Gen4, 16 Gb/s, NVMe (Upgradable Upto 2*1 TB SSD) | OS: Windows 11 Home 64-bit
  • Ports: 1 x USB 3.2 Gen 1 port with power-off charging, 1 x USB 3.2 Gen 1 port, 1 x USB 4 port | Features: Backlit keyboard

Pricing Details

Acer Nitro V Gaming Laptop AMD Ryzen 7-7735HS with RTX 4050 6 GB Graphics (16 GB DDR5/512GB SSD/Windows 11 Home/ Wi-Fi 6/144Hz) ANV15-41, 15.6 available online in India at an offer price of ₹73740 (27.7052% discount from MRP) on Amazon. Offer Note: Inc. ₹8250 OFF with HDFC CC. Discounted Price: ₹73740. MRP: 101999. Savings: ₹28259. Discount: 27.7052%. This deal was updated by @rakhi on 13th February, 2025 at 7:25 PM.

More Offers you might like

🔥 60% OFF Flipkart
ASUS Chromebook Plus Intel Core i3 12th Gen 1215U - (8 GB / 128 GB)
Get Deal
🔥 93% OFF Flipkart
PHILIPS 4 in 1 USB DLK5527C / 00 USB Hub
Get Deal
🔥 56% OFF Flipkart
ZEBRONICS Pro Series Z Core i7 12th Gen 1255U (16 GB / 512 GB SSD) Laptop
Get Deal
🔥 82% OFF Amazon
Gmyle Unisexs Bag (Multicolor)

Gmyle Unisex's Bag (Multicolor)

₹176 ₹999 Save ₹823
Get Deal